EBRD-BACKED GREEN FINANCING

Savings-Backed Financing Model

Process water, heat, caustic, salt and chemical recovery projects developed by VERITAS ENVIRONMENT may be evaluated individually under green financing programs supported by the European Bank for Reconstruction and Development (EBRD).

The financing structure considers measurable water, energy, chemical and disposal savings alongside the repayment schedule. Where technically and financially feasible, the system may contribute positively to operating cash flow from year one.

INITIAL EQUITY 0 Units

A structure designed to preserve working capital in this illustrative scenario.

ANNUAL SYSTEM SAVINGS 26 Units

Benefits from water, energy, chemicals and resource efficiency.

TOTAL REPAYMENT 117,40

Total repayment over an illustrative 60-month financing term.

5-YEAR CASH DIFFERENCE +12,60

Difference between 130 units in savings and 117.40 units in payments.

FINANCING LOGIC · IN 10 SECONDS

Investment → savings → payment → positive cash flow impact

See the key figures of the illustrative scenario in one sequence. Every chart below uses the same model.

01 · INVESTMENT 100 units

Normalized total investment cost.

02 · SAVINGS 26/year

Annual net savings generated by the system.

03 · TERM 60 months

Illustrative financing term.

04 · ANNUAL PAYMENT 23,48

Payment assessed alongside the savings flow.

05 · NET IMPACT +2,52

Illustrative positive annual cash contribution.

✓Working capital flexibility
✓Savings and payments in one view
✓Measurable decision support
FINANCING DASHBOARD

See the figures over five years

Compare the investment’s annual and cumulative impact using different views of the same illustrative scenario.

CHART 01

Annual Savings / Payments / Net Difference

+2.52 / year
3020100 2623,48+2,52 2623,48+2,52 2623,48+2,52 2623,48+2,52 2623,48+2,52 Year 1Year 2Year 3Year 4Year 5
Annual savings Financing payment Net difference

Each year, 26 units in savings versus 23.48 units in payments produces an illustrative annual cash difference of +2.52 units.

CHART 02

Five-Year Total Financial Balance

+12.60-unit difference
Five-Year Savings 130
Total Repayment 117,40
Net Cash Difference +12,60
140 105 70 35 0 130 117,40 +12,60 Total Savings Total Repayment Net Cash Difference
Total repayments as a share of five-year savings %90,31

Over the illustrative five-year period, 130 units in savings are compared with 117.40 units in total repayments; the resulting difference is +12.60 units.

CHART 03

Financial Summary of a 100-Unit Investment

100
Investment
130
Five-Year Savings
117,40
Total Payments
+12,60
Cash Difference
CAPITAL STRUCTURE COMPARISON

One investment, two cash flow paths

Compare the five-year cumulative impact of equity funding and financing in the same chart area.

CHART 04

Equity — Cumulative Net Impact

3.85 years
+40+200−50−100 −100 −74 −48 −22 +4 +30 InvestmentYear 1Year 2Year 3Year 4Year 5

With 26 units in annual savings, the cumulative impact turns positive during the fourth year.

CHART 05

Financing — Cumulative Net Cash Difference

+12.60 / 5 years
151050 0 +2,52 +5,04 +7,56 +10,08 +12,60 StartYear 1Year 2Year 3Year 4Year 5

In the illustrative scenario, initial equity is 0 units, while the annual net difference is +2.52 units.

HOW DOES THE MODEL WORK?

In five steps: from preliminary feasibility to financing balance

Each step delivers measurable results to inform the next decision.

01 · BASELINE

Measure Current Costs

Collect water, energy, chemical and disposal data on a common basis.

Baseline costs
02 · DESIGN

Develop the Technical Solution

Define capacity, equipment, automation and investment scope.

Investment scope
03 · SAVINGS

Calculate Net Benefits

Calculate net annual savings after operating expenses.

Annual net savings
04 · FINANCING

Structure the Repayment Plan

Align the term and payment frequency with the project.

Payment scenario
05 · DECISION

Assess Cash Flow Impact

Compare savings and financing payments annually.

Net cash impact
QUICK SCENARIO CALCULATOR

Review your project’s financing balance instantly using key parameters

The tool below provides an illustrative scenario for initial review. A project-specific feasibility study requires technical site data and a financing assessment.

Illustrative Financing Calculator

Enter the investment amount, annual net savings, interest rate and term to compare monthly payments with annual cash flow impact.

Illustrative Results

The entered values are calculated using equal monthly installments, displaying the balance between savings and financing.

FINANCED AMOUNT 100,00

Based on investment amount and initial equity

MONTHLY PAYMENT 1,96

Illustrative equal monthly payment

ANNUAL PAYMENT 23,48

Annual equivalent of monthly payments

ANNUAL CASH FLOW IMPACT +2,52

Difference between net savings and annual payments

SCENARIO OUTLOOK Savings generate a positive cash flow balance that supports annual financing payments.
BASIS OF THE FINANCING CALCULATION

Which savings and investments are considered?

Explore measurable savings and eligible investment types in two concise tables.

Savings Included in the Calculation

WaterAnnual savings on mains or well water use
Energy & HeatRecovery and reuse of hot process streams
Caustic / Salt / ChemicalsReturning process inputs to the production cycle
DisposalAnnual cost benefit in sludge and waste management
OperationsBenefits from process continuity and resource efficiency

Eligible Investment Areas

Process Water & HeatWater and energy recovery projects
Wastewater ReuseColor removal and reuse systems
Caustic RecoveryProcesses combining chemical, water and heat recovery
Salt & RegenerationSalt and regeneration water recovery systems
Process UpgradesCapacity, energy and resource efficiency investments
PRELIMINARY FEASIBILITY STUDY

Turn technical data into an investment decision

Technical feasibility, annual net savings and financing balance are brought together in one decision framework.

TAILORED TO YOUR PROJECT

Let’s Build Your Preliminary Feasibility Assessment

Using your facility’s production, water, energy, chemical and wastewater data, we assess investment cost, annual net savings, payback period and financing balance.

REQUEST A PRELIMINARY FEASIBILITY STUDY
Production capacityAnnual baseline consumption scenarioBaseline data
Water consumption & wastewaterRecovery potentialWater balance
Wastewater characterizationTechnical process designProcess suitability
Energy & chemical consumptionResource efficiency calculationAnnual savings
Unit costsActual annual cost baselineCost baseline
Investment & operating costsNet savings and paybackFinancial feasibility
Financing planSavings / payment balanceCash flow
Sensitivity scenariosDifferent operating conditionsDecision support
FREQUENTLY ASKED QUESTIONS

Before making a decision: five key questions

Financing terms are determined for each project based on project data and the relevant financing institution’s assessment.

How does this model’s financing structure work?+
Investment cost and financing charges are included in the repayment plan. Measurable net savings generated by the system are compared with financing payments in the same feasibility model.
When can a positive cash flow impact begin in the first year?+
Positive annual cash flow may arise when annual net savings exceed annual financing payments. This balance is calculated using facility-specific data.
How is initial equity determined?+
The zero initial equity shown is illustrative. Actual equity requirements depend on project cost, the company’s financial position, collateral terms and the financing institution’s assessment.
How do economic benefits continue after the financing term ends?+
The system continues improving resource efficiency and generating savings. Net economic value is tracked against current savings and the system’s operating and maintenance costs.
How is actual savings performance verified?+
Baseline consumption before investment is compared with measured consumption after commissioning, accounting consistently for production volume, operating hours and unit costs.
THE FIRST STEP FOR YOUR PROJECT

Assess financing potential using your facility’s actual data

Investment cost, annual net savings, payback period and financing balance are assessed together in a project-specific feasibility study.